Nighttime sign reflectivity assessments are scheduled at DRJBTC Toll-Supported Bridges on Tuesday, Sept. 22 and Wednesday, Sept. 23. Contractors will begin at the Lower Trenton Bridge and work their way upstream (north) to the Riverton-Belvidere Bridge.
WASHINGTON CROSSING – The Delaware River Joint Toll Bridge Commission today announced that temporary travel restrictions for motorists and pedestrians will be needed to carry out an upcoming [...]
FRENCHTOWN, NJ – The rehabilitation project at the Uhlerstown-Frenchtown Toll-Supported Bridge has passed the halfway point, the Delaware River Joint Toll Bridge Commission announced today. At [...]
LAMBERTVILLE, NJ – Two videos related to the 2024-25 New Hope-Lambertville Toll-Supported Bridge Rehabilitation Project have been posted for public viewing on the Delaware River Joint Toll Bridge [...]
NEW HOPE, PA – The New Hope-Lambertville (Route 202) Toll Bridge will be reduced to single travel lanes in each direction for a multi-faceted construction project that is scheduled to get [...]