Northampton Street Bridge (Easton-Phillipsburg 'free bridge) -- The Northampton Street Toll-Supported Bridge (a.k.a. the Easton-Phillipsburg 'free bridge') is scheduled to be restricted to single lanes in each directions between 8 a.m. to 2 p.m. from Monday, June 1, to Thursday, June 4. The daytime travel restriction is needed for biennial inspections of the bridge structure. Motorists are urged to reduce speeds and exercise caution.
WASHINGTON CROSSING – The Delaware River Joint Toll Bridge Commission today announced that temporary travel restrictions for motorists and pedestrians will be needed to carry out an upcoming [...]
FRENCHTOWN, NJ – The rehabilitation project at the Uhlerstown-Frenchtown Toll-Supported Bridge has passed the halfway point, the Delaware River Joint Toll Bridge Commission announced today. At [...]
LAMBERTVILLE, NJ – Two videos related to the 2024-25 New Hope-Lambertville Toll-Supported Bridge Rehabilitation Project have been posted for public viewing on the Delaware River Joint Toll Bridge [...]
NEW HOPE, PA – The New Hope-Lambertville (Route 202) Toll Bridge will be reduced to single travel lanes in each direction for a multi-faceted construction project that is scheduled to get [...]