Nighttime sign reflectivity assessments are scheduled at DRJBTC Toll-Supported Bridges on Tuesday, Sept. 22 and Wednesday, Sept. 23. Contractors will begin at the Lower Trenton Bridge and work their way upstream (north) to the Riverton-Belvidere Bridge.
TRENTON, NJ – The elevated ramp that carries traffic from Route 29 south to Route 1 south and the Trenton-Morrisville Toll Bridge’s Pennsylvania-bound travel lanes is scheduled to be shut down [...]
MORRISVILLE, PA. – Masonry repair work is expected to begin sometime next week on the stone piers that support the 140-year-old Calhoun Street Toll-Supported Bridge between Trenton, N.J. and [...]