The weekly closure schedule for the shared-use path on the Scudder Falls (I-295) Toll Bridge has changed.
Starting Friday, May 8, the shared-use path for pedestrians and bicyclists sicheduled will be closed from 7 a.m. on Mondays to 6 p.m. on Fridays (times approximate).
The weekly walkway closures are expected to continue until May 29 (date subject to change) — enabling a Commission contractor to remove and replace the uneven puddle-prone polyester polymer concrete (PPC) surface along the bridge’s elevated walkway surface.
The bridge walkway facility’s entry points will be blocked weekdays at the Delaware & Raritan Canal’s rail trail on the New Jersey side and the Delaware Canal towpath on the Pennsylvania side.
Affected bicyclists and pedestrians are urged to use the Calhoun Street Bridge walkway to the south or the Washington Crossing Bridge walkway whenever the Scudder Falls facility is closed. Bikes must be walked across the walkways at those two alternate crossings.
