The start date for 96-hour-long weekday closures of the Scudder Falls (I-295) Toll Bridge’s 0.86-mile-long Shared-Use Path for pedestrians and bicyclists sicheduled be closed for 96-hour-long periods on a weekly basis until the Memorial Day Weekend.

Closures of the bridge’s walkway will begin early on Mondays and continue until early Friday mornings. The walkway is expected to be reopened for use on weekends.

The weekly closures will enable a Commission contractor to remove and replace the uneven puddle-prone polyester polymer concrete (PPC) surface along the bridge’s elevated walkway surface.

The bridge walkway facility’s entry points will be blocked at the Delaware & Raritan Canal’s rail trail on the New Jersey side and the Delaware Canal towpath on the Pennsylvania side.

Affected bicyclists and pedestrians are urged to use the Calhoun Street Bridge walkway to the south or the Washington Crossing Bridge walkway whenever the Scudder Falls facility is closed. Bikes must be walked across the walkways at those two alternate crossings.

Share This