Nighttime sign reflectivity assessments are scheduled at DRJBTC Toll-Supported Bridges on Tuesday, Sept. 22 and Wednesday, Sept. 23. Contractors will begin at the Lower Trenton Bridge and work their way upstream (north) to the Riverton-Belvidere Bridge.
WASHINGTON CROSSING – The Washington Crossing Toll-Supported Bridge is scheduled to be shut down to all vehicular traffic between 10 a.m. and 2 p.m. on Tuesday, Apr. 21, the Delaware River Joint [...]